Construction Day 1: Photos

mimo-sde-construction-hdu-day-1-sde21-wuppertal

Impressions from the first day of construction of our house demonstration unit (HDU) for the Solar Decathlon Europe 21/22 finals.

We have successfully prepared the site, constructed the steel grate, inserted the GFM plates and the insulation into the steel grating, laid a cable duct on the steel grate and built a pipe to the outdoor unit (heat pump).